Online Customization
cast iron flange fittings couplings and joints
Ductile iron qt450-12 material casting, with the advantages of high elongation and high strength, natural gas pipeline, water supply pipeline system components.
Application
Click for a discount
Q1: Are you a manufacturer?
A1: Yes.
Q2: How long is the new product development cycle?
A2: The mold making period of new product is 30 days.
Q3: What’s the time for new product sample making?
A3: 10 days.
Q4: How to ensure product quality?
A4: Using the national table pig iron, the molten iron was detected by the rapid analyzer before the smelting time, and the material was adjusted.
Q5: What’s the inspection equipment ?
A5: There are fast analyzer before furnace, Jin Xiangyi, hardness tester, tensile testing machine, product testing equipment is complete.
Q6: What’s the processing equipment?
A5: CNC lathe, CNC machining center, vertical drilling machine
Q7: What’s the offer time of new product?
A7: About 5 days
Q8: How long will the batch production take?
A8: The new product can be produced in bulk within 10 days after the confirmation of the new product, and a container can be completed every month