In this way, our products have continued to obtain marketplace acceptance and clients satisfaction over the past couple of years. EPG is a skilled producer and exporter that is involved with the design and style, improvement and production. In the meantime, our goods are created in accordance to large quality specifications, and complying with the international superior normal conditions. OEM ampODM EPTT Brass Cast Reduce Compression Coupling(AV7003)
EPT: Brass ampcopper
StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd: EN1254-two
Surface area treatment: Brass shade, nickel plated or chrome plated
Dimension: 15mm to up
Certification: ISO9001:2008, CE, SGS
Merchandise | Designation | EPT |
one | Body | Brass, CW617N |
4 | Seat/EPT | PFTE |
5 | ring | CW617N Brass or copper |
seven | Nut | Brass |
Photographs of differ types fittings
OUR Companies
Samples:
1) we can make the samples according to customer’s samples or styles.
two) Our designer staff can complete the samples timely, the actual sample shipping time relies upon on thesample’s design, usually in fifteen doing work times.
three) For EPTT layout samples, the customers have to pay for the relative design price. (When your orEPTTreach a certain sum, we will return again the design charge to you
Cost Terms:
FOB, CFR,CIF.and so on.
WE ACCEPTT A lot of Fee , These kinds of AS RMB, US DOLLAY, EUR, KORAD, POUND..And so forth
Payment Terms:
1) T/T, thirty% T/T deposit prior to generation, pay out the stability just before cargo.
two) L/C at sight (for big amount get)
three) 100% T/T in EPT, D/P
Purchase and Mass Creation:
1) We will deliver PROFORMA Bill to you when the buy is verified.
2) We will begin to have mass production when confirm our sample and 30% T/T deposit EPTd.
3) EPTT is below the handle and supervision in the course of the production.
4) EPTT data will be confirmed before the creation completed, If no EPTT requirment, utilizing our
regular deal.
EPTT manage and inspection:
1) Will be check out by QC when EPT amp add-ons inspection up arrival
2) In line manage on Each and every Action
three) Every one valve will be extensive overview prior to EPTT
four) EPT will be place verify prior to shipping and delivery
5) Third Party inspection This kind of as CE, SABS and so on
6) EPT authorization by means of ISO9001:2008
Approach ampQC